01 / Project brief
A backyard home at Juniper House.
Fictional Parcel F-01 is the same property used in the Property Information Report.
- Homeowner goal
- Explore a detached, one-story ADU of about 700 square feet. Retain two front parking spaces and enough rear garden for daily use.
- Starting information
- A simulated 7,200-square-foot lot, recorded 1,280-square-foot house, owner-sketched rear area of 60 by 45 feet, and approximately 6-foot side path.
- Known conflict
- The owner sketch suggests a 1,340-square-foot house. Resolve the 60-square-foot difference and the incomplete patio history before treating the base as reliable.
- Decision to make
- Is there enough promise to justify a measured test layout, or should the owner revise the idea or pause for a controlling answer first?
02 / Conceptual test
The target is 700 square feet.
A 28-by-25-foot rectangle illustrates the target area. It is not a floor plan or a placement that has passed a site review.
- Illustrative arithmetic
- 28 ft × 25 ft = 700 sq ft. The sketched rear area is 60 ft × 45 ft = 2,700 sq ft. The target footprint is about 26% of that gross rectangle.
- What this does not establish
- The remaining area is not automatically usable. Setbacks, easements, existing improvements, access, utilities and other project conditions have not been resolved.
03 / Study inputs
Use the property report, then test the idea.
Every input in this worked example is fictional. No real agency lookup or site investigation has been performed.
- S-01 to S-03 / Simulated records
- Property characteristics, residential map context and an incomplete permit index. They identify questions; they do not settle zoning or existing-condition status.
- S-04 / Owner sketch
- Estimated rear area, side route, house and parking positions. Useful to frame questions, unsuitable as a verified drawing base.
- S-05 / Owner priorities
- Detached, one story, about 700 square feet, retain two parking spaces and garden. These are preferences that can be adjusted.
- Not supplied
- Measured site information, survey/title documents, utility confirmation, applicable planning standards, consultant conclusions or written agency direction.
04 / Feasibility findings
What the initial test supports.
The example has enough information to identify the next useful checks, but not enough to confirm a buildable design.
- Spatial opportunity / Worth measuring
- The gross rear area exceeds the target footprint. This supports a measured test layout as a possible next step; gross area alone does not prove a compliant location.
- Existing base / Resolve first
- The house-area mismatch and incomplete patio record could change the base plan. Obtain the records and measured conditions before fixing the ADU position.
- Access / Unresolved
- The sketch suggests a 6-foot side path. Width, obstructions, equipment movement and any required access conditions remain unchecked.
- Utilities / Unresolved
- No route or capacity is confirmed. Identify provider questions and responsible consultant input before assuming a connection can follow the sketched route.
05 / Controlling questions
Four answers could change the path.
These are questions to verify, not conditions presumed to exist.
- Planning requirements
- Confirm the jurisdiction, applicable zoning and ADU requirements for the actual project. No setback, height, coverage or parking exemption is asserted in this sample.
- Boundaries and easements
- A constraint along a rear or side edge could change placement. Obtain the appropriate evidence before using the sketch as a legal boundary.
- Service route and capacity
- A constrained connection route or service upgrade could affect scope and the owner’s decision. No utility allowance or cost is included.
- Physical conditions
- Grade, drainage, vegetation and the patio footprint may affect a test layout. Establish the relevant conditions rather than relying on the model illustration.
06 / Options after verification
Keep, adjust, or pause the idea.
The preferred path depends on what the controlling checks establish.
- A / Test the 700-square-foot goal
- If the measured base and controlling requirements support it, proceed to a separately scoped test layout. Retain parking and garden priorities in the brief.
- B / Test a smaller alternative
- If usable space conflicts with the original goal, compare a 24-by-25-foot, 600-square-foot rectangle. This is an illustrative alternative, not a confirmed fit.
- C / Pause for an answer
- If a record, legal boundary, utility or agency question controls the project, resolve that item before further layout work.
07 / Study conclusion
Promising, with checks still required.
For this fictional case, the next investment should establish a reliable base and resolve the priority questions.
- Recommendation
- Start with the house/patio records and measured existing conditions. Then confirm planning and utility questions that could change the concept.
- Continue when
- The source conflict is reconciled and there is enough verified information to locate a meaningful test layout. Document any remaining assumptions.
- Revise when
- Verified constraints make the 700-square-foot goal conflict with access, services, parking or garden priorities. Compare the smaller option deliberately.
- Pause when
- A controlling answer is unavailable or the owner cannot accept the resulting scope. No construction budget or permit outcome has been established.
08 / Action plan
Make the next project step specific.
A practical sequence for the fictional homeowner and project team.
- 1 / Homeowner and record source
- Request the underlying house and patio records. Share relevant existing documents and confirm the two parking spaces and garden priorities.
- 2 / Appropriate measurement or survey provider
- Prepare the measured existing base and resolve boundary information needed to locate the work reliably.
- 3 / Study follow-up
- Discuss the findings in the included 30-minute remote walkthrough. One written clarification request is included within seven days of delivery; new research or design is separately scoped.
- 4 / Define the next service
- After the priority checks, agree whether to commission a test layout or permit-document scope, revise the target, or pause.
- Service limits
- No field measurement, survey, title work, design drawings, engineering, energy calculations, utility investigation, cost estimate, application, agency negotiation, construction or guaranteed outcome is supplied.