All projects

Agua Cayendo residence

A 1,388 sq ft four-bedroom home with a recessed entry, stepped parapets and an attached two-car garage.

City
Desert Hot Springs
Project type
Single-family residence
Living area
1,388 sq ft
Stage
Proposed design

Project notes

Develop the exterior character

Stepped parapets, recessed openings and a compact covered entry give the single-story home a distinct street-facing composition.

Resolve the flat-roof composition

Low-slope roof planes sit behind the parapets and connect the house and attached garage without dominating the exterior form.

Update the plan through coordination

Manuel provided the original floor-plan concept. Alexis revised the plan as the exterior design and coordination with the owner and engineer developed.