Juanita Street Loma Linda Residence
A 1,602 sq ft four-bedroom residence shaped by owner review, site constraints and an approved front-yard setback variance.
- City
- Loma Linda
- Project type
- Single-family residence
- Living area
- 1,602 sq ft
- Stage
- Built (designer reported)
Native Blender study of the September 2026 design revision. The revision approval and correspondence to completed construction are unconfirmed. Planting, paving and street context are illustrative.
Residential design, drawing development and permit coordination by Alexis Vasquez through Space Makeover LLC, with Manuel Luna's review. Visualizations show the September 2026 design revision.
Project notes
Give shared rooms a central place
Living, dining and kitchen spaces form a connected sequence from the front entrance toward the rear of the home.
Separate the bedroom groups
Three bedrooms share a hallway on one side; the primary suite sits across the plan with its own bathroom and walk-in closet.
Develop the design around the setback
The City approved a 3-foot-9-inch encroachment into the required 25-foot front-yard setback. Alexis coordinated the design and owner review through Space Makeover. The design visualizations show a later September 2026 amendment; its approval is not asserted here.